Cited by the base fire inspector?

On Camp Pendleton, sprinkler write-ups come from one office. The Camp Pendleton Fire Department's Fire Prevention Branch does fire inspections and plan review across the installation, under a Deputy Chief of Fire Prevention who holds the title of base Fire Marshal. Its report tells you what to fix.

We've taken that call. One Camp Pendleton caller had an inspection report citing sprinkler heads with heavy debris buildup, with roughly a week to clean or replace them. Send us the report first. It shows which heads and where.

Dirty heads usually get replaced. Wiping dust, lint or paint off a head can damage the heat-sensitive element, and a head coated in buildup may open late or throw a poor spray pattern when a fire finally reaches it.

Which rules set your schedule

The base is a Department of Defense installation. Its fire protection criteria come from UFC 3-600-01, Fire Protection Engineering for Facilities, in place of a city or county code. Under the current change to that standard, the reviewing role is called the Component Fire Protection Engineer.

Sprinkler upkeep itself follows NFPA 25, the national standard for inspection, testing and maintenance:

  • Quarterly inspections.
  • An annual inspection and test of the system.
  • A 5-year internal pipe assessment, plus gauge replacement or testing.
  • Replacement or sample testing of heads that have been in service for 50 years.

California's Title 19 adds a 5-year service and certification by a State Fire Marshal licensed contractor. Does that apply to a federal building? Confirm with the Fire Prevention Branch which schedule governs your facility before you book the work.

What happens on a service visit

The technician starts at the riser. They read the gauges, check that control valves are open and secured, and open the inspector's test valve to prove the water flow alarm sounds. Then comes the walk-through. Heads, pipe and hangers get checked for damage, paint, corrosion, loose fittings and storage stacked too close to the heads.

Coastal buildings need a closer look. The base has more than 17 miles of Pacific shoreline, and sprinkler parts in buildings near the water sit in salt air, so corrosion on heads and exposed pipe is one of the first things to check.

Base access and licensing

Camp Pendleton is a closed installation. Off-base contractors need base access before any on-site work. Plan for it when you pick a date. When you call, give us the building and its area (Mainside, Las Pulgas, San Onofre or another numbered area).

California work for 1 Pro Fire is done by Hedrick Fire Protection. Hedrick holds C-16 (fire protection) and C-10 (electrical) contractor licenses and is licensed by the California State Fire Marshal under Title 19 for inspection, testing and maintenance of water-based fire protection systems.

Call (619) 568-5440 or email socal@1profire.com with your inspection report or building details.

Our services include

Sprinkler service questions

An inspector cited our sprinkler heads for heavy debris and gave us about a week. What now?

Email us the report. Loaded heads are usually swapped for matching new heads. If the deadline is tight, ask the Fire Prevention Branch about it.

Has this location been serviced before?

Look at the tag on the riser. It shows the last service date and the company that did it, and your past inspection reports fill in the rest.

Who inspects sprinkler systems on Camp Pendleton?

The Camp Pendleton Fire Department's Fire Prevention Branch. Led by the base Fire Marshal, it also reviews fire protection design for all new construction on the base.

How often does a sprinkler system need service?

NFPA 25 calls for quarterly and annual inspections. A 5-year internal pipe assessment comes on top. Confirm with the Fire Prevention Branch which schedule your building follows.

Camp Pendleton Links