Skip to main content

Your hood system answers to the Fire Prevention Bureau

Opening a restaurant? Remodeling a cook line? In Simi Valley, plans for new construction and remodels go to the Ventura County Fire Department's Fire Prevention Bureau, which reviews them, inspects the new building before it opens and keeps inspecting the business after that. The hood system is in that file.

So an install has two jobs. It has to put out a grease fire, and it has to match the plans the Bureau approved.

What goes into a new system

We install pre-engineered wet chemical systems listed to UL 300, the test standard for systems that protect commercial cooking appliances. A typical install includes:

  • Nozzles over each fryer, griddle, range and broiler, plus the hood plenum and duct.
  • Fusible-link heat detectors in the hood that trip the system without anyone touching it.
  • A manual pull station near the kitchen exit.
  • A fuel shutoff for gas or electric appliances, tied to the system so the cooking surfaces stop heating the moment the agent discharges.
  • A Class K portable extinguisher.

Older dry chemical systems don't meet UL 300. If you're remodeling around one, plan to replace it.

The 2025 fire code applies from January 1, 2026

Ordinance 34, adopted by the Ventura County Fire Protection District, took effect January 1, 2026 and brings in the 2025 California Fire Code with local amendments. It replaced the 2022 edition. Drew your plans last year? Ask the Bureau which edition your permit falls under before you order equipment.

Who installs it

California work for 1 Pro Fire is done by Hedrick Fire Protection. Hedrick holds C-16 (fire protection) and C-10 (electrical) contractor licenses, is State Fire Marshal licensed under Title 19 for extinguisher and water-based system service, and is licensed to install and service commercial kitchen hood fire suppression systems.

Final inspection, then the six-month cycle

With the system in and tested, the building needs its fire inspection. The Bureau takes requests at (805) 389-9744. Call by 3:00 p.m. the business day before. Have your Fire Prevention case number ready.

Then the service schedule begins: NFPA 96 and NFPA 17A call for semi-annual inspection, and metal-alloy fusible links get replaced at least that often. Our fire kitchen service in Simi Valley covers those visits.

Before you install: common questions

Does a new hood system need plan review in Simi Valley?

The Ventura County Fire Department's Fire Prevention Bureau reviews plans for new construction and remodels in Simi Valley, and it inspects new buildings before they open. Ask the Bureau what your kitchen project needs to submit.

Can you add onto my old dry chemical system?

Usually not. Older dry chemical systems don't meet UL 300, so we'd quote a listed wet chemical replacement.

Do I still need a portable extinguisher?

Yes. Kitchens protected by a suppression system also need a Class K portable extinguisher, the class rated for fires in cooking oils and fats.

How often does the system need service after it's installed?

Every six months. That's the semi-annual inspection NFPA 96 and NFPA 17A call for.

Planning a kitchen in Simi Valley? Call (213) 568-0188 or email socal@1profire.com with your appliance list and hood length, and we'll walk through what the install involves.

Get a quote on your kitchen system

(213) 568-0188 or socal@1profire.com

Start your kitchen project

(213) 568-0188