Skip to main content

Your sprinkler plans go to Brea's own fire department

Brea isn't a county fire city. It runs its own Brea Fire Department, and the department's Fire Prevention Bureau is the office that reviews plans and inspects construction projects inside city limits. That's where a new sprinkler system, or an extension of an existing one, has to pass before anyone can occupy the space.

The code matters too. Brea enforces the 2025 California Fire Code, which took effect January 1, 2026, and it applies to plans submitted on or after that date. Ask the Fire Prevention Bureau about any local amendments before design starts. A quick call up front can save a resubmittal later.

How an installation job runs

  1. Site visit and scope. We look at the building, how it's used and what's already there.
  2. Water supply. Sprinkler design depends on the water available at your connection. The City of Brea Water Division runs the city's water system, including backflow prevention, so questions about the city side of your service go to them.
  3. Design and drawings. The layout is drawn for your occupancy and storage, then prepared for submittal.
  4. Plan review. Drawings go to the Fire Prevention Bureau.
  5. Installation and testing. Pipe, heads and valves go in, and the system is tested before the fire department signs off.

Each step depends on the one before it. Skip the water question and the design can stall.

Design around how the space gets used

A sprinkler only works if water can reach the fire. Brea's annual life safety checklist requires storage to stay at least 18 inches below sprinkler deflectors. Plan for it now. If you expect tall racking in an industrial park unit, or a stockroom behind a storefront near Brea Boulevard, tell us the real storage height before the layout is drawn (it's far cheaper to design for it than to move heads after the inspector flags it).

Uses change. A space that was offices may become storage, and that can mean the system needs a fresh look.

After the install: the system needs upkeep

Installation is the start. Brea's annual inspection checklist calls for annual and/or five-year certification of fire protection systems, and buildings with more hazardous occupancy types also get a fee-based annual inspection from a Brea Fire Department Fire Prevention Specialist. NFPA 25 sets quarterly and annual inspections, and California Title 19 requires a five-year service and certification by a State Fire Marshal licensed contractor. Our Brea fire sprinkler service page covers that work, and restaurants can see restaurant sprinkler inspections in Brea.

Who does the work

California work for 1 Pro Fire is performed by Hedrick Fire Protection. Hedrick holds C-16 (fire protection) and C-10 (electrical) contractor licenses and is licensed by the California State Fire Marshal under Title 19 for inspection, testing and maintenance of water-based fire protection systems.

Planning a project? Call us at (949) 558-2201 or email us at socal@1profire.com. Send the address, floor plans if you have them and what the space will be used for.

More for Brea properties: our Brea fire protection hub, Brea fire alarm systems and annual fire hydrant testing in Brea. Working outside the city? See fire sprinkler installation in Orange County or fire sprinkler installation in Los Angeles County.

Brea sprinkler installation questions

How long does it take to get a proposal?

It depends on the building. Floor plans, the building's use and your planned storage height help us price an installation without guesswork.

Can the work start this week?

Usually not for a new system. New systems and major additions go through Fire Prevention Bureau plan review before installation begins, so call us and we'll talk through where your project sits in that process.

Do you do fire flow tests for the city of Brea?

No. The City of Brea Water Division runs the city's water system, so ask them about the city side. For a private hydrant on your own property, see our hydrant testing page.

Which fire code will my plans be reviewed under?

Plans submitted on or after January 1, 2026 fall under the 2025 California Fire Code. Confirm amendments with the Fire Prevention Bureau.

What happens after the system is installed?

It goes on an inspection and certification schedule. Our sprinkler service page explains it.

Our services include

Start a sprinkler installation quote in Brea

  • The building address
  • Floor plans, if you have them
  • What the space is used for and how high you'll store goods
(949) 558-2201 or socal@1profire.com

Send what you have. We'll ask for the rest.

Planning a build-out in Brea?

Bring us in before your drawings go to the Fire Prevention Bureau.

(949) 558-2201

Early is easier.